Solutions

From process pain to validated automation.

We start with your production floor, not our product catalog. Each solution follows a proven four-stage delivery methodology.

Industry scenarios

A

Automotive & Tier-1

Challenge

Takt-time pressure, line-side delivery chaos, skilled labor shortage for weld fixtures.

System

AGV line-side delivery + 6-axis arm fixture handling + vision docking.

Value

30% floor-space saving, 99.2% delivery-on-time, 2-year payback.

F

Food & Cold Chain

Challenge

-25 degC environments, hygiene wash-down cycles, high SKU palletizing.

System

Cold-rated AMR fleet + cobot palletizing with AI depalletizing.

Value

24/7 operation, 18 ppm palletizing, 40% labor reduction.

E

E-commerce Logistics

Challenge

Order spikes, pick errors, labor-intensive put-wall sorting.

System

Pick-to-cart AGVs + vision put-wall + WMS integration.

Value

1,200 orders/h, 99.9% pick accuracy, 35% cost-per-order reduction.

P

Pharmaceutical

Challenge

Serialization compliance, contamination control, batch traceability.

System

OCR/barcode gateway + AIV transport in cleanrooms + full 21 CFR traceability.

Value

100% serialization compliance, zero batch-mix risk, audit-ready logs.

Reference configuration & scale

Indicative hardware mix for each industry. Final selection is always driven by your material flow, takt time and site constraints.

IndustryFleet & mobile robotsRobotic armsVision systemsControl & integration
Automotive & Tier-12–9 AGVs (SLAM + magnet hybrid)KUKA KR 6–20 / FANUC M-20iD2D/3D docking + cosmetic inspectionFleet scheduler + MES/OEE interface
Food & Cold Chain4–11 cold-rated AMRsCobot palletizing (15–18 kg)AI depalletizing + label OCR24/7 scheduler + wash-down audit log
E-commerce / 3PL10–24 pick-to-cart AGVsGoods-to-person (arm optional)Vision put-wall, barcode + OCR per slotWMS wave integration
PharmaceuticalAIV cleanroom transportSealed 6-axis cell (as required)OCR serialization gateway21 CFR traceability + audit-ready logs

Our delivery methodology

01

Industry challenge & site audit

2-week data collection on flow, takt and bottlenecks, ending in a written concept with an ROI baseline.

02

System architecture & simulation

Fleet simulation, cell layout and safety concept validated before any hardware is ordered.

03

Equipment integration & safety

Robots, vision and control integrated and pre-commissioned with CE / ISO 13849 risk assessment.

04

Commissioning, training & ROI tracking

Site go-live, operator training and a shared KPI dashboard for continuous optimization.

Traditional line vs automated cell

Illustrative before/after for a typical manual assembly or handling line after automation. Your numbers come from the site audit.

MetricTraditional (manual / semi-auto)Automated solutionImprovement
Cycle time (per unit)120 s75 s−37.5%
Yield rate95.2%98.7%+3.5%
Operators per shift61−83%
Payback period≤ 24 months

Related case studies

The same four-stage methodology, applied to real production lines.

Want a feasibility study for your plant?

Free site audit for qualified projects. We deliver a written concept within 10 working days.

Request Feasibility Study